文献类型: 会议论文
第一作者: Li Dengqian
作者: Li Dengqian 1 ; Tan Ping; Tuo Boming;
作者机构: 1.Postdoctoral Programme, CPEB, Xi'an 710021, China; Engineering Technology Research Inst., CPEB, Xi'an 710021, China
关键词: horizontal well;multi-steps thin gas reservoir;controlling track technology;MWD surveying;geological steer drilling technology of the horizontal well
会议名称: Proceedings of the World Engineers' Convention 2004 vol F-A:Resources and Energy
主办单位:
页码: 349-353
摘要: SLG gas field belongs to the CQ Oil Company located at Inner Mongolia Autonomous Region northwest of China. It is very difficult to sidetrack a horizontal well at this area. The difficult points are: deep kick-out point, hard and thin pay-zone, long horizontal section, horizontal section must be controlled in the box with height of ± 2 meters. A number of geology and engineering data of some offset wells were analyzed, we optimized the well structures, the hole profiles and the bits of the well SP - 1 and SP-2, researched the BHA, compound drilling technique, landing and horizontal section track controlling, geological steer drilling.lt made the well SP - 1 and SP - 2 successfully drilled. As a result, the 4 steps horizontal well of the SP - 1 was completed with meeting the geologist' s needs, and the well SP - 2 horizontal section were walking along the target range of ± 2 meters.
分类号: F124.5
- 相关文献